Multiply the investment by three, It’s possible?

The secret is the technology* is that today it is cheaper than the traditional work, the rapid installation of the work, the combination of the work team and the administrative management of the project (PMP Project Management Professional).

*Structural system based on Concrete and Steel for the construction of Multifamily Homes, Schools and other service buildings (Residences, Hospitals, Luxury Homes) – European Patented System – more sustainable, more efficient, safer against earthquakes and with energy savings electrical.

Research Development Technological Innovation

Steel is a system to gain insulation, security in both exterior and interior finishes.

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 540 m2

Project execution: 6 months CH plus 3 months SF

CHALET AISLADO – TORREBLANCA – FUENGIROLA – MALAGA – ESPAÑA

CHALET AISLADO – TORTOSA – TARRAGONA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 270 m2

Project execution: 1 months CH plus 2 months SF

REMONTA EDIFICIO 6 PLANTAS – EL POBLET – SAGRADA FAMILIA – BARCELONA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 660 m2

Project execution: 1 months CH plus 1 months SF

REMONTA CHALET – MONT ROIG – MIAMI – TARRAGONA – – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 242 m2

Project execution: 1 months CH plus 1 months SF

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 120 m2

Project execution: 5 days CH plus 15 days SF

VESTUARIO FUTBOL – POLIDEPORTIVO MARBELLA – MALAGA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 180 m2

Project execution: 15 days CH plus 30 days SF

OFICINA DE TURISMO – SANT CARLES DE LA RAPITA – TARRAGONA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 279 m2

Project execution: 25 days CH plus 5 months SF

VILLA – BUENAVISTA – MIJAS – MALAGA – ESPAÑA

CHALET AISLADO – BUENAVISTA – MIJAS – MALAGA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 376 m2

Project execution: 25 days CH plus 5 months SF

Next Project 2024 – 2025

CAMPUS UNIVERSITARIO – MALAGA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 6000 m2

Project execution: CH 1 month plus 10 months SF

CHALET AISLADO – MIJAS – MALAGA – ESPAÑA

Initial investment of the project for concrete foundation (CH) and steel framing (SF): 589 m2

Project execution: CH 5 month plus 7 months SF

For the Architect

Technical Office at your service.

Takes care of measurements and budget.

Takes care of System Report and Calculations.

For the Promotor

Offers the most advanced technology, of the best quality and at the best price.

Ensures that the Final Design has the maximum constructorion detail possible.

Guarantees higher quality construction work (precision and performance).

Systems performance is Thecnical Monitoring Offices, without technical reservations.

Guarantees the processing of the ten-year insurance policy.

The time saved when implementing the design allows:

For the Building Contractor

Reduces the time required to raise the buildings structure to one third of that required in conventional construction.

Simplifies site management (fewer components, personnel, etc).

Onsite assembly errors are impossible.

Easily handled components. No need for a fixed crane on site. Reduces the risk of onsite accidents.

There are teams of authorized fitters available.

Constructed using prefabricated parts and completely dry methods.

Are you interested in construc with us? Lets Start Now

With more than 20 years of leadership in structural engineering for public and private works, FutureSteel® offers proven solutions for all types of homes. Our innovative technology is designed to help maximize efficiency and resiliency at every stage of the process to work smarter with stronger construction.

Do you want to know more about our projects? – Project in Marbella (work public «Futbol Arroyo Firts») – Project in Tortosa ( work private » Villas»)- Project in Miami ( work private » Villas»)- Project in Barcelona – Project in Mijas ( work private » Villas») – Project in Fuengirola (work private «Villas») – Project in Sant Carles de la Rapita (work public «Office Tourist») – Project in Africa – Sao Tomé i Principe (work public «embassy and business center»).








TRANSLATE NOW